libcats.org
Главная

Construction scheduling, cost optimization, and management: a new model based on neurocomputing and object technologies

Обложка книги Construction scheduling, cost optimization, and management: a new model based on neurocomputing and object technologies

Construction scheduling, cost optimization, and management: a new model based on neurocomputing and object technologies

,
Presents a general methematical formula for the scheduling of construction projects. Using this formula, repetitive and non-repetitive tasks, work continuity considerations, multiple-crew strategies, and the effects of varying job conditions on the performance of a crew can be modeled. It provides a practical methodology which will be of great benefit to all those involved in construction scheduling and and cost optimization.
EPUB | FB2 | MOBI | TXT | RTF
* Конвертация файла может нарушить форматирование оригинала. По-возможности скачивайте файл в оригинальном формате.
Популярные книги за неделю:

50 рецептов для аэрогриля

Автор:
Категория: house, house, cook
Размер книги: 771 Kb

Ключ к сверхсознанию

Автор:
Категория: Путь к себе
Размер книги: 309 Kb

Contemporary Theatre, Film and Television, Volume 97

Автор:
Размер книги: 3.18 Mb
Только что пользователи скачали эти книги:

Психология влияния

Автор:
Категория: Психология
Размер книги: 1.68 Mb

Quining Qualia

Автор:
Категория: Philosophy
Размер книги: 5.98 Mb

History Of Our War with Spain Including Battles on Sea and Land

Автор: , Автор:
Категория: История
Размер книги: 81.96 Mb

The Last Full Measure

Автор:
Категория: fiction
Размер книги: 671 Kb